Kreiskrankenhaus Salzwedel New build ward block and treatment wing | |
Client: Kreiskrankenhaus Salzwedel Brunnenstr. 1 29410 Salzwedel Architect: Planungsring Dr. Pawlik Bundesallee 87 12161 Berlin www.planungsring.com Construction period: 1. Construction stage 1993 - 1995 2. Construction stage 1998 - 2000 Total construction cost: 53.170.000 € Fee structure: III, low |
|
Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics /structural verifications (EnEV, acoustic and thermal insulation) Construction type: Solid construction, individual and strip foundations, waterproof concrete basement, floors, beams and supports in grid of 7.50 x 7.50 m of reinforced concrete, wooden roof construction |
Projects | Behring Krankenhaus | Anatomy building on Charité Berlin-Mitte |