Erwin Schrödinger-Zentrum, New build library centre, remodeled production plant, in Berlin-Adlershof | |
Client: Senatsverwaltung für Bau, Wohnen und Verkehr, Berlin Senatsverwaltung für Wissenschaft und Forschung, Berlin WISTA-Management GmbH Rudower Chaussee 17 12489 Berlin Mr. Pohlmann, Tel. o3o - 9o 13 93 2o o Architects: Dipl.-Ing. B. Gössler mag. arch. D. Gössler Dipl.-Ing. Kreienbaum www.architekten-goessler.de Construction period: 2000 - 2002 Total construction cost: 40.400.000 € Fee structure: III, low Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics/structural verifications (EnEV, acoustic and fire protection) Construction type: New build and conversion, integration of four listed production plant buildings. Library centre of steel construction, remaining new buildings of reinforced concrete, solid construction. Reinforced concrete and sectional steel used in conversion, waterproof concrete basement, individual and strip foundations and slabs. |
|
|
Projects | FU-Berlin, Department of History | Hall of Residence and Student Union Building, TU-Berlin |