Frau-Mutter-Kind-Zentrum (Woman-Mother-Child Centre) in Berlin-Neukölln | |
Client: VIVANTES Netzwerk für Gesundheit GmbH Klinikum Neukölln, Abt. IV Technik und Bau Rudower Str. 48 12313 Berlin Herr Popp, Tel. 030 - 41 94 51 67 Architect: Karl Schmucker + Partner Planungsgesellschaft mbH P3/14 Planken 68161 Mannheim www.schmucker-partner.de Construction period: 2003 - 2004 Total construction cost: 34.260.000 € Fee structure: III, low |
|
Completed work stages: HOAI, § 64, LP 1 to LP 6 and building physics /structural verifications (EnEV, acoustic and thermal insulation) Construction type: Solid reinforced concrete construction comprising ward block and functional wing with underground car park, lat slab floor above underground car park (due to installation), external basement walls and base slab in waterproof concrete, areas of ward block without basement built on strip foundations, basement and underground car park with raft foundation, reinforced concrete shear walls, building connecting ward block and functional wing as rotunda with steel and glass roof. |
Projects | Ruppiner Kliniken, houses X and Z | GSZM Moabit |